Jayco, Inc Plant #51 – Middlebury
Building Use – Class A Motor Home production and offices Project Size – 107,140 sq. ft. one-story building Building Facts – Pre-engineered steel building with multiple mezzanines and two-story office |
Duncan Systems – Elkhart
Building Use – New corporate offices, marketing center and RV replacement glass warehouse Project Size – 53,130 sq. ft. building Building Facts – Pre-engineered steel building including corporate offices. Unique exterior design. |
American Millwork – Elkhart
Building Use – Manufacturing of wood trim Project Size – 37,050 sq. ft. building 2002; 29,390 sq. ft. building in 1995 Building Facts – Pre-engineered steel building additions |
Homecrest Cabinetry – Goshen
Building Use – Manufacturing, warehouse and offices for production of wood cabinets Project Size – Over 200,000 sq. ft. of building Building Facts – Multiple projects since the '70s. Conventional steel structure and pre-engineered steel building. |
Tri-State Compressed Air Systems – Goshen
Building Use –Offices and warehouse Project Size – 28,120 sq. ft. building Building Facts – Pre-engineered steel building warehouse and offices |
Goshen Stamping – Goshen
Building Use – Manufacturing and warehouse Project Size – 20,960 sq. ft. building Building Facts – Pre-engineered steel building addition utilizing VP Buildings' Open Web framing for improved lighting and flexibility of building systems. |
Carriage Inc. – Millersburg
Building Use – RV Manufacturing facility Project Size – 136,542 sq. ft. Building Facts – Pre-engineered steel building with interior mezzanines of structural steel and bar joist construction. State-of-the-art facility increases Carriage’s production capacity by 50%. |
Essenhaus Noodle Factory – Middlebury
Building Use – Office and noodle production space Project Size – 2,375 sq. ft. office space; 9,248 sq. ft. production area; 23,115 sq. ft. warehouse Building Facts – Special noodle production equipment was imported from Italy. DJ ensured that the infrastructure required for the equipment was in place prior to its arrival. Before the completion of the facility, the company was able to produce 400 pounds of noodles per hour. Upon completion, production increases to 1,500 pounds per hour. |
Seating Technology – Topeka
Building Use – Manufacturing furniture and upholstery for mobile homes Project Size – 67,650 sq. ft. Building Facts – Manufacturing facility contains 3,830 sq. ft. of office space and four truck loading docks. |
Director’s Showcase – Ligonier
Building Use – Manufacturing marching band equipment Project Size – 10,000 sq. ft. Building Facts – New warehouse building enhances the company’s distribution of marching band equipment. |
Turtle Top Plant 8 – New Paris
Building Use – Maintenance, production, service bays for transportation buses Project Size – 8,400 sq. ft. Building Facts – The new steel building replaces a building destroyed by fire. The DesignBuild project was Turtle Top's fourth major project with DJ Construction in the last two years. |
Royal Crown Limited – Milford Additions
Building Use – Manufacturing quality vinyl products for decking, railing and fencing Project Size – 12,800 sq. ft. Building Facts – Two steel additions to manufacturing facility for grinding and compounding equipment. |
Vinyl By Design – New Paris Addition
Building Use – Manufacturing vinyl products Project Size – 10,000 sq. ft. Building Facts – Addition greatly expands storage and manufacturing space. |
Jayco Plant #15 – Middlebury Addition
Building Use – RV Manufacturing Facility Project Size – 34,000 sq. ft. Building Facts – Steel addition includes 2,500 square feet of office and break room space, two new loading docks and 13,000 sq. ft. of new mezzanine in the existing space. |
Weber Products – Elkhart
Building Use – Office/Warehouse facility Project Size – 7,000 sq. ft. Building Facts – 50’ X 100’ metal building and wood-framed office. Spanning just five months from initial contact to completion. |
Triangle Rubber Co., Thermoplastics Division – Goshen
Building Use – Manufacturing Elastomeric Rubber Products Project Size – 12,500 sq. ft. Building Facts – Second addition to the original facility increases productivity. DJ also completed the first 9,000 sq. ft. addition. |
Laidig Systems Powder Coat Line Addition – Mishawaka
Building Use – Manufacturing powder coating steel products, warehouse space Project Size – 39,125 sq. ft. Building Facts – The steel/masonry addition is used for powder coating steel products and includes warehouse space. The building's concrete floor has pits and imbedded rails for the elaborate equipment, and the building includes an overhead crane system. The project was completed in two phases to allow for uninterrupted workflow for the owner. |
Jayco Plant 41 – Middlebury
Building Use – Motorhome manufacturing Project Size – 31,150 sq. ft. Building Facts – The project included 6,000 sq. ft. of new mezzanine as well as new and renovated areas throughout the building. It was needed to accommodate growing demand for motorhomes produced by the company's Entegra Coach division. Jayco first approached DJ about this project in December 2009 and asked how quickly the building could be occupied. After that first meeting, Jayco was using the new space in less than six months, including design, pricing and even as construction progressed over a difficult winter season. |